If you’ve spent any amount of time around the Nature Center this summer, you’ve seen lots going on. Most notably is the completion of a 100-foot long bridge connecting Hickory Trail to Huston Woods Trail. This project was started late last fall with excavation and the pouring of concrete for footers. After some wet weather throughout the spring delaying our work, the bridge finally came together at the end of June. Be sure to make some time in your schedule to hike out to this destination piece. See map for bridge location.